MCT ENGINEERED SYSTEM

Swelling construction-joint waterstop

Hydrophilic swelling strip in concrete construction joints and around pipes

Swelling construction-joint waterstop

CONDITIONS

Start with the site

Hydrophilic swelling strip in concrete construction joints and around pipes · Concrete · Below-grade | water-retaining

This swelling-strip route is separate from PVC waterstop detailing.

MCT / STAGES

System stages

See each stage in context, understand its technical role and open the relevant MCT product data directly.

APPLICATION SEQUENCE

Select a stage. Follow its role to the product and technical data.

Surface preparation

  1. Use dry, smooth surface

    System material reference; prepare the substrate as described above.

    Bento Rubber StripTDS ↗
  2. Place strip in the middle of the joint

  3. Secure with steel nails or adhesive

  4. Overlap 10 cm and nail

  5. Wrap around pipe with 10 cm overlap

MCT / PRODUCT ROLES

MCT products in this system

MCT / TDS

Technical data

TDS / CURRENT

MC-Bento Rubber Strip

Revision 2.0 ·

PROJECT / NEXT STEP

Bring us the condition on site.

Share the project stage, substrate, problem and site condition. If you used Solution Finder, your technical summary comes with you.

Ask an Engineer