Grouting / STAGES
Precision epoxy equipment grouting
Epoxy grout beneath machinery/baseplates requiring high mechanical/chemical performance
MCT Solutions
Match the grout route to the load, void, placement condition and service environment.

THE CHALLENGE
Compare cementitious and epoxy directions, then confirm the final project-specific choice with an MCT engineer when required.
THE SYSTEM
Grouting / STAGES
Epoxy grout beneath machinery/baseplates requiring high mechanical/chemical performance
Grouting / STAGES
Cementitious precision grouting for baseplates, bolts, equipment and structural bearing zones
THE MATERIAL
Non Shrink Grout & Repair Materials
Ready- to- use, Non- shrink Grout Meets Non- shrink requirements of CRD – C 621-83
Non Shrink Grout & Repair Materials
Ready –to-use, non-shrink grout, natural in color, flowable, high strength, meets non shrink requirements of CRD-C588-76 and CRD 621
Non Shrink Grout & Repair Materials
Non – shrink , Fluid High strength, meets Non- shrink requirements of CRD-C588-76
TDS
PROJECT / NEXT STEP
Share the project stage, substrate, problem and site condition. If you used Solution Finder, your technical summary comes with you.